Calgary Mayor Jyoti Gondek has criticized city officials for inadequate communication during the ongoing water emergency caused by a broken feeder main. She emphasized the severity of the situation and the need for water conservation measures to prevent running out of water. Gondek highlighted the challenges and timeline for repairing the critical water transmission line, noting that it will take at least five to seven days due to the size and complexity of the infrastructure. The city has been relying on water from an alternate plant, but reservoirs are at risk of depletion if conservation measures are not followed. Gondek acknowledged previous communication challenges and pledged to improve public updates.
Results for: Infrastructure Maintenance
The second phase of Mumbai’s ambitious Coastal Road project, connecting Marine Drive to Worli, is set to open to the public on June 10. However, the first phase of the project, inaugurated in March 2023, has encountered a leakage issue. The leakages are being addressed through polymer grouting, which will be implemented on all 25 joints on both sides of the tunnel to prevent further water seepage.
The LaSalle Causeway in Kingston, Ontario, remains closed indefinitely due to structural damage, causing concerns about the impact on traffic and marine activities. According to Kingston’s mayor, Bryan Paterson, the ongoing closure has affected pedestrians, cyclists, motorists, and boaters. The causeway’s closure is part of a phased repair project, with the first phase focusing on strengthening the bridge and the second phase addressing the damaged section. The timeline for reopening the crossing is yet to be announced.