Over 930 local and 72 long-distance trains have been canceled in Mumbai and Thane until June 2 for infrastructure upgrades. This will significantly impact travelers, with stranded passengers and heat exposure expected during the disruptions. Two infrastructure projects are underway – a 63-hour maintenance block in Thane and a 36-hour block at CSMT.
Results for: Infrastructure Upgrades
Ten years after the Flint water crisis, the city is inviting residents to tour the water treatment plant that was the center of the disaster. The tours will showcase upgrades made to the plant and infrastructure since the crisis, including a new secondary water connection and chemical feed building. Mayor Sheldon Neeley will attend the opening of the tours, which will coincide with the 10th anniversary of the city’s switch to the Flint River as its water source.