Chennai Metro Rail Limited (CMRL) has significantly reduced the size of underground stations in its phase-2 project, aiming to save over ₹2,000 crore in project cost. This was achieved by optimizing the tunnel ventilation system, reducing the number of exhaust fans from eight to two, and redesigning the layout of the stations. Despite the smaller size, the new system ensures safety during emergencies and meets international standards.